Based in Nottingham, covering projects nationwide. SafeContractor approved and ISO certified. We plan work around your schedule, including evenings and weekends, so your site keeps running.
Industrial
Residential
Trusted on commercial & public-sector schemes
An approved decorating contractor working alongside national main contractors, and on premium private residences, across the UK.
Industry Certifications & Compliance
SafeContractor
CSCS Certified
IPAF Trained
SSSTS
City & Guilds
ISO CertifiedAccredited teams, clear programmes, and a finish that passes inspection first time.
High-volume corporate interiors, office refurbishments, and retail environments. On-programme delivery with minimal disruption to business operations.
Anti-corrosion coatings, intumescent fire protection, and industrial floor finishes on large-scale structural projects.
High-end interior and exterior decoration for private clients, developers, and renovation projects.
Intumescent coatings on structural steelwork with accurate dry film thickness recording and full certification documentation.
Evening, weekend, and phased programmes for hotels, hospitals, retail, and other live environments, planned around your operations.
Dust-free vacuum sanding, airless spray application, and specialist coatings for high-spec environments including healthcare and food production.
Five steps from first site visit to final sign-off. The same process on every job, large or small.
Detailed assessment and accurate, transparent pricing.
Minimising disruption. Out-of-hours scheduling where required.
Meticulous masking, priming, and surface preparation.
Expert application using premium British materials.
Thorough clean-up, inspection, and zero-punch handover.
A selection of recent commercial and residential work across sectors.
Industrial
Anti-corrosion and intumescent system applied to 40,000 sq ft steel framework. Full DFT recording and fire-safety certification provided to principal contractor. Works completed on-programme, live environment throughout.
Commercial
Full redecoration of occupied office floors, including meeting rooms, breakout areas, and corridors. Low-odour materials and out-of-hours phasing kept the business running throughout, with a clean handover on completion.
Hospitality
Phased redecoration of guest bedrooms and en-suites in a city-centre hotel. Rooms turned around in tight windows between checkout and check-in to protect occupancy, using low-odour finishes and a clean handover on each one.
Full interior redecoration of a period home, including heritage colour-matching to the original scheme and specialist hand-finished joinery. Completed over two weeks with no snagging. The owner has rebooked us for exterior works this summer.
What Clients Say
"On site, on programme, and on brief every day. The finish on the structural steelwork was inspected and signed off without a single punch item."
Mark Henderson
Project Manager, Henderson Build Ltd
"Brought T & D in for our school summer programme, 18 classrooms in six weeks. They worked cleanly, respected the environment, and left the site better than they found it."
Sarah Briggs
Facilities Manager, Eastwood Academy
"The hotel corridor project was finished two nights early with no guest complaints. Exactly the kind of reliable, professional subcontractor we want on our framework."
Lisa Turnbull
Operations Director, Turnbull Property Group
Working alongside main contractors, compliance, and how we operate.
Ready to discuss your commercial or residential project? Contact our Nottingham office directly or complete the form.
We'll be in touch within one business day to arrange a survey.